Built ~ BR Crewe Production Order ~ Order Lot 400 To traffic ~ March 20th 1965
DETAILS
T/M connection ~ AP (All Parallel)
Brakes (as built) ~ Metcalfe-Oerlikon - Dual air/vacuum
Radiators (as built) ~ Serck hydrostatic shutters
Boiler (as built) ~ Clayton Mk.II (UBC)
Flush ends ~ Both ends. At one time was flush at both ends, but with lenses and grommets. Replaced with non-recessed flush front at No.1 end, and conventional panel at No.2 end
D1670 ~
MAMMOTH ~ At Landore TMD without ceremony August 1965
47085 ~
MAMMOTH ~ February 1974
~ Name retained when renumbered into TOPS
~ Plates missing by 1975
~ Replaced by October 1978
~ Plates missing again in 1984
~ Replaced in February 1985
~ Removed August 1988.
47085 ~
Conidae ~ At Crewe Diesel without ceremony August 1988
~ Removed June 1991
47085 ~
REPTA 1893-1993 ~ At Willesden International Freight Centre by Mrs.Grace Ward, wife of REPTA company secretary September 6th 1993
~ Name originally planned for 47156