47544 was moved by low-loader from Doncaster Works to Springburn Works for cutting up. The lorry was stopped at Garstang on the M6 when it was discovered that the load was too high to meet with bridge clearance regulations. Before continuing the journey north the roof had to be cut off the 47, and final arrival in Glasgow was not until 3 days later.
06/91
disposal by MC Metals Glasgow
This page was last updated on June 27th 2022 at 23:34 GMT.